The line set sets the labor
Every foot of refrigerant line between the outdoor unit and each head has to be run, insulated, and brazed, then tested for leaks before it's sealed into the wall. A straight run through one exterior wall takes far less time than a line that has to climb, turn a corner, or cross to a far side of the house. The distance and the number of bends decide how long the crew is there, not just how many heads are going in.







